2,举例
以上的检查是比较粗糙的,还需要结合ITP(inspection and test plan)才能具体化。
国外的某个无损检测的ITP
3,哪些检测资料需要存20年
a) necessary certification of materials, such as mill test reports, for pressure-containing parts and rotating elements;
必要的材料证书,比如承压件和转动件的mill test report
b) test data and results to verify that the requirements of the specification have been met;
测试数据和结论(验证符合规范的要求)
c) fully identified records of all heat treatment whether performed in the normal course of manufacture or as part of a repair procedure;
无论是正常制造过程的还是修复过程的所有热处理的完全识别记录
d) results of quality control tests and inspections;
质量控制测试和检验的结果
e) details of all repairs;
所有维修的细节
f) as-built assembly and maintenance clearances;
最终制造的组装和维护间隙
g) other data specified by the purchaser or required by applicable codes and regulations (see 5.1 and I.3.1.1);
其他规定的数据
h) purchase specifications for all major items on bills of materials.
卖方标准的材料清单
END
往期内容精选:
啥!API610中不允许使用平衡盘来平衡轴向力?——漫话API610第12版
什么情况下必须对泵组进行扭振分析——漫话API610第12版
啥!Class 150等级的OH2泵就一定不是API泵?泵壳承压的要求——漫话API610第12版