宜捷海特天津维修基地最近完成了三架莱格赛650的96月检。
三架飞机的定检工作在不到4个月的时间内完成,第一架飞机在短短9周内出厂。96月检是对此种机型机身进行的全面检查,需要3000多个工时。检查包括完全拆除飞机内饰进行机身框架内部结构检查,拆除前油箱和机身油箱以及机翼前缘、襟翼、起落架和飞行控制系统进行彻底检查。
宜捷海特是巴西航空工业公司的授权服务中心,为多家公务机原厂商的多机型提供航线和定检维修服务。宜捷海特根据中国民航局、美国联邦航空局、欧洲航空安全局及以其他国家和地区的局方批准,通过其位于天津和北京的维修设施,为各种机型提供航线维护和定检维修以及区域内AOG支援服务。
The work on all three Embraer aircraft was performed simultaneously and within four months. One of the aircraft completed its heavy maintenance check in nine weeks. The 96-month inspection is the most extensive on the Legacy airframe and entails over 3,000 labour-hours. This heavy check includes full removal of the cabin interior, down to the fuselage frames for structural inspection. Both the forward and ventral fuel tanks are also removed, as is the wing leading edges, flaps, landing gear and flight controls.
“Completing these highly complex projects in less than four months, further demonstrates our proficiency in managing and simultaneously performing multiple heavy base maintenance inspections while still ensuring that we keep within our customers’ demanding flight schedules and budgets,” says Paul Desgrosseilliers, general manager of ExecuJet Haite. “We will continue to strengthen our processes and procedures to improve our overall quality and minimize aircraft downtime.”
ExecuJet Haite is an Authorized Service Center for Embraer Executive Jets and provides maintenance support to various original equipment makers (OEMs) and aircraft types using certifications from the Civil Aviation Administration of China (CAAC), the US FAA, European Aviation Safety Agency (EASA), and several other national aviation authorities. The company has base and line maintenance centers at Beijing Daxing International Airport and Tianjin’s Binhai International Airport. It also has a line station at Beijing Capital International Airport.