Recently, at the overseas construction site, Shantui Janeoo's 4 sets of E5R-090 concrete batching plants have successfully completed the installation and commissioning, and will soon be applied to the construction of Chile's No. 5 Highway, which is known as the "Cheerilee Highway", showing the style of China's large-scale infrastructure.
▌山推建友E5R混凝土搅拌站采用模块化结构、集装箱式封装、积木式搭建,管线预装、单元化运输,安装时间短、生产效率高,是国内外施工建设的必备利器。其骨料配料系统采用斜皮带机上料、大方量配料机存储,保证了大小骨料输送及使用;计量秤根据不同物料采用不同称量结构形式,以粗精称计量和抖动计量技术保障计量误差小于1%,大大高于标准要求;耐磨衬板、叶片,保障了搅拌主机超长使用寿命,混凝土原料拌合更匀质;智能控制系统,能够全过程检测混凝土生产情况,实时故障诊断、报警,管控更智能、更科学。
Shantui Janeoo E5R concrete batching plant adopts modular structure, containerized packaging, building block construction, pipeline pre-assembly, unitized transportation, short installation time and high production efficiency, which is an essential tool for construction at home and abroad. Its aggregate batching system adopts inclined belt conveyor feeding and generous batching machine storage, which ensures the transportation and use of large and small aggregates; The measuring scale adopts different weighing structure forms according to different materials, and the measurement error is less than 1% with coarse and fine weighing and jitter measurement technology, which is much higher than the standard requirements; The wear-resistant lining plate and blades ensure the long service life of the mixing host and make the concrete raw materials more homogeneous; The intelligent control system can detect the concrete production situation in the whole process, real-time fault diagnosis and alarm, and the management and control is more intelligent and scientific.
▌据悉,智利5号公路是智利国家经济运行的大动脉,不仅承载着智利南北交通的重任,而且是“一带一路”倡议的关键工程。项目建成后,将极大地缓解智利南部城市群核心城市交通压力,进一步推动智利南北地区的互联互通,带动沿线相关产业发展和解决劳动力就业问题。
It is reported that Chile Highway 5 is the main artery of Chile's national economic operation, which not only carries the heavy responsibility of Chile's north-south transportation, but also is a key project of the "Belt and Road" initiative. After the completion of the project, it will greatly alleviate the traffic pressure of the core cities of the southern Chilean urban agglomeration, further promote the interconnection between the north and south of Chile, drive the development of related industries along the route and solve the problem of labor employment.